Air Control Engineering Services (ACES)
Air Conditioning - Mechanical - Electrical · PEC C6 Contractor #46437
72/S Office # 203, Shahwar Trade Center, PECHS Block 2, Karachi · Tel: 021-34313366, 0345-2106053 · Email: acesexpert@gmail.com
Excellence in Heating, Ventilation, Air Conditioning & Refrigeration (HVAC-R) installations and associated applications across Pakistan.
Turnkey Capabilities & Key Engineering Personnel
Professional Capabilities:
- Installation & Execution of complete project (all type of A/C systems).
- Complete Ducting, Piping, Sizing, Routing & Distribution Networks.
- Control Wiring, MCC & MCCB Panels complete in all respect.
- Plumbing (Cooled & hot water supply, sanitary drainage, fixtures).
- Fire Protection & Hydrant Line Execution.
- Facility Operations & Preventative Maintenance Overhauls.
Key Personnel:
Mr. Mustafa Ali — Chief Executive Officer (CEO)
Mr. Wasi Khan — Project Engineer
Engr. M. Shahzeb Khan — Project Engineer
Engr. Emmad Ali — Project Coordinator
Mr. Uzair Rizvi — Project Coordinator
5 Site Supervisors: Mr. Naveed, Mr. Intekhab Haider, Mr. Abid, Mr. Zain-ul-Abideen, Mr. Zahid.
Executed Projects Summary (Multi-Million Turnkey Contracts)
| Project Name | Scope / System | Contract Value | Status |
|---|---|---|---|
| Fauji Meat Limited | Central Chilled Water System | 20.0 Million | Completed |
| Fauji Meat Limited | Admin Block VRF System | 6.7 Million | Completed |
| IBA Sukkur Academic Block | Central System (300 TR) | 15.5 Million | Completed |
| Indus Pharma Plot 63 & 64 | Clean Room HVAC & Utilities | 16.2 Million | Completed |
| Baradari PC Hotel | Car Parking Ventilation & Fire Fighting | 17.8 Million | Completed |
| SUPARCO Plant Building # 8 | Packaged Type A/C System (120 TR) | 2.6 Million | Completed |
| English Biscuit Ltd (EBM) | Mixing, Cutting & RUFC Areas Central System | 5.5 Million | Completed |
| Shabbir Tiles Unit 1 & 2 | Power House, Office & Lab HVAC | 6.08 Million | Completed |
| IBM NTO Building Karachi | Central System (350 TR) | Turnkey | Completed |
In-House Heavy Machinery Fleet & Technical Workers
24 Equipment & Machinery Lines:
450 AMP Rectifier & Rotary Welders, 250A Transformer Welders, Gas Cutting Torches, 300 Rft Scaffolding, 5-Ton Chain Blocks, 7″ & 4″ Grinders, Hilti Rotary Hammer Drills, 1/2″ to 2″ Threading Sets, 6-Ft Sheet Metal Press Binder, High-Vacuum Deep Evacuation Pumps.
50+ Technical Workforce Roster:
5 Site Supervisors, 6 Duct Fabricators, 10 Fabricator Helpers, 3 Pipe Fabricators, 5 Pipe Helpers, 5 HVAC Technicians, 10 Technician Helpers, 2 Electricians, 4 Electrician Helpers, 2 Electronics Techs, 2 Electronic Helpers.