A.R.T. Engineering Associates
High-authority consulting engineering firm delivering comprehensive MEP master planning, HVAC system design, NFPA fire fighting infrastructure, and public health engineering across Pakistan.
Over 35 Years of Intelligent Design & Committed Integrity
A.R.T. Engineering Associates was established in 1987 by a group of forward-thinking engineers and professionals. Since then, over 100 prestigious projects have been designed and delivered nationwide, setting new industry benchmarks in energy efficiency and MEP innovation.
By upholding unwavering professional integrity, meticulous engineering calculations, and top-tier construction supervision, A.R.T. stands today as one of the most respected consulting engineering practices in Pakistan.
Adherence to International Codes & Standards:
Executive Leadership
Established A.R.T. and heads current practice. 40+ years experience covering advanced building MEP design, emerging technologies, plant operations, and large-scale project management.
Mechanical engineer with nearly 15 years experience across mechanical and plumbing design, complex piping, fire protection networks, plant room coordination, and MEP management.
Mechanical engineer with 40+ years deep engineering experience focusing on building MEP operations, complex plant schematics, and mechanical infrastructure maintenance.
Core Engineering Capabilities
Heating, Ventilation & Air Conditioning
Concept development & detailed design, schematics & layout drawings, Combined Heat & Power (CHP), Waste Heat Recovery (WHRS), Clean Rooms, Cold Rooms, Energy Efficiency Analysis, and Top Supervision.
Fire Fighting System Design Services
NFPA standard automatic sprinkler design, piping route layouts, hydraulic calculations, fire pump sizing, hose stream & tank sizing, riser layouts, and smoke/heat detector engineering.
Plumbing & Public Health Engineering
Water supply networks (cold & hot water), sanitary drainage, water treatment plants, storm water runoff, plumbing fixture schedules, and external municipal infrastructure connections.
Data Centers & Mission Critical
Precision thermal cooling, high-density server rack climate management, redundant CRAC/CRAH systems, clean agent fire suppression, and strict environmental controls.
Tender & BOQ Preparation
Accurate Bill of Quantities (BOQ), comprehensive technical specifications, tender evaluation reports, vendor pre-qualification, and contractor coordination.
Construction Management & Supervision
Project scheduling, resource planning, method statement approvals, on-site quality assurance, progress monitoring, and witnessing final system commissioning.
Prestigious Organizations Designed by A.R.T.
Major Projects by Industry Sector
Completed across the last 3 decades showcasing specialized multi-disciplinary engineering.
Office & Corporate Towers
- NIB Bank PNSC Building, Karachi
- Barclays Bank Regional & Head Offices
- Sindh Revenue Building, Karachi
- State Life Insurance Building, Karachi
- Allied Bank Building, Islamabad (220 TR)
- Reckitt & Colman Offices, Karachi (100 TR)
- Standard Chartered Bank NJI & PRC Buildings
Commercial & Shopping Plazas
- World Trade Center Islamabad (6,000 TR / 2,400 TR WHRS)
- Evacuee Trust Buildings 1 & 2, Islamabad (2,600 TR)
- City Center, Rawalpindi (1,000 TR Central Absorption)
- Meridian Shopping Mall, Rawalpindi (1,200 TR)
- Millennium Mall, Murree (800 MBH Heating)
- Technocity & Gul Plaza Shopping Malls, Karachi
- Dolmen Mall Clifton (Nine West, Mango, Alkaram, C&K Outlets)
Hospitals & Healthcare
- Liaquat National Hospital, Karachi
- Aga Khan University Hospital, Karachi
- Sheikh Zayed Hospital, Muzaffarabad (1,000 TR)
- Sheikh Zayed Hospital, Rawlakot
- National Hospital Defence, Karachi (350 TR)
- Trauma Center SMBB Hospital, Sukkur (400 TR)
- Dental Hospital & Dr. Altamash Clinic, Karachi
Industrial Plants & WHRS
- English Biscuit Manufacturers (EBM) Hot Water Absorption (450 TR)
- Continental Biscuits Sukkur (Phase 1 & 2 Multi-Energy 800 TR)
- Shabbir Tiles & Ceramics (Phase 1 & 2 Absorption 350 TR)
- Aisha Steel Mills, Karachi
- Artistic Denim & Liberty Textile Mills
- Gatron Pvt Ltd Hub (850 TR Absorption WHRS)
- AJ Textile Mills Hattar (1,500 TR Multi-Energy WHRS)
Pharmaceutical Clean Rooms
- Pfizer Pakistan Ltd (Production & Xanax Area)
- Indus Pharma, Karachi
- GlaxoSmithKline (GSK) Karachi
- Wyeth Pakistan Ltd & Cyanamid Pharma
- Swe-Pak Pharmaceuticals Hub, Balochistan
- Harmon & Nawan Laboratories, Karachi
- Swiss Pharmaceuticals & Nabi Qasim Industries
Mission Critical Data Centers
- Standard Chartered Bank Head Office Data Center
- Standard Chartered Operational Building Data Center
- Soneri Bank Al-Rahim Tower Data Center
- Barclays Bank Head Office Data Center, Karachi
- Barclays Bank Islamabad Data Center
- Unilever Avari Tower Head Office IT Infrastructure
- NIB Bank PNSC Building Central Server Room
A.R.T. Projects Pictorial Showcase
Design implementations across high-rise buildings, fire protection pump houses, healthcare central systems, and cleanroom complexes.
Commercial High-Rise HVAC Design
World Trade Center & Evacuee Trust 6,000 TR Absorption Systems
NFPA Fire Pump Station Design
Hydraulic Calculation & Automated Dual Riser Sprinkler Engineering
Liaquat National Hospital Central Plant
Healthcare Air Exchange, Positive Pressurization & Chilled Water
Mission Critical Data Center Cooling
Standard Chartered Precision CRAC Systems with N+1 Redundancy
Industrial Food Clean Room WHRS
English Biscuit Manufacturers (EBM) 450 TR Waste Heat Recovery
Pfizer & Indus Pharma Cleanroom Facilities
HVAC Particle Sizing, Relative Humidity Control & Differential Pressure
Licenses & Professional Registrations
Pakistan Engineering Council (PEC)
Registration No: CONSULT/1578 · Field: MECH/16469 (Mechanical Engineering Works Only).
Pakistan HVACR Society
Corporate Member entitled to all rights and privileges provided by the Constitution & Bylaws.
ASHRAE Pakistan Chapter
International association for heating, refrigerating, and air conditioning engineers standards compliance.
Complete Delivered Projects Roster
Exhaustive list of major mechanical, absorption chiller, fire fighting, and central systems delivered nationwide.
| S# | Project Title | Type & System Nature | Capacity | Client / Architect |
|---|---|---|---|---|
| 01 | World Trade Center (WTC), Islamabad | Multi Energy Absorption Chiller System | 2,400 TR | Archvision / Giga |
| 02 | Evacuee Trust Building 1 & 2, Islamabad | Central Chilled Water System | 2,600 TR | Naqvi & Siddiqui |
| 03 | AJ Textile Mills, Hattar | Multi Energy Absorption Chiller WHRS | 1,500 TR | AJ Textile Mills |
| 04 | RJ Shopping Mall, Karachi | Centralized Chilled Water System | 1,300 TR | Mr. Hanif Japanwala |
| 05 | Meridian Shopping Mall, Rawalpindi | Central Heating & Cooling System | 1,200 TR | Meridian Shopping Mall |
| 06 | City Center, Rawalpindi | Central Absorption Chiller System | 1,000 TR | Archvision |
| 07 | A.J.K Hospital, Muzaffarabad | Central Heating & Cooling System | 1,000 TR | Ashfaq Associates |
| 08 | SMBB Trauma Center Upgrading | Upgrading Existing Central System | 1,000 TR | Naqvi & Siddiqui |
| 09 | Gatron Pvt Ltd, Hub Balochistan | Hot Water Absorption Chiller WHRS | 850 TR | Gatron Pvt Ltd |
| 10 | English Biscuit Manufacturers (EBM) | Hot Water Absorption Chiller System | 450 TR | EBM |
| 11 | Continental Biscuits Sukkur (Phase 1 & 2) | Multi Energy Absorption Chiller WHRS | 800 TR | CBL |
| 12 | Gul Plaza Shopping Mall, Karachi | Central Absorption System | 450 TR | Archvision |
| 13 | Lakson Tobacco, Karachi | Ventilation System | 450 TR | Lakson Tobacco |
| 14 | Serena Hotel, Quetta | Hot Water Absorption Chiller System | 400 TR | Serena Hotels |
| 15 | Trauma Center SMBB Hospital, Sukkur | Multi Energy Absorption Chiller System | 400 TR | Naqvi & Siddiqui |
| 16 | Kurdson Industries, Lahore | Multi Energy Absorption Chiller WHRS | 400 TR | Kurdson Industries |
| 17 | Saima Packages, Karachi | Hot Water Absorption Chiller System | 400 TR | Saima Packages |
| 18 | Shabbir Tiles Karachi (Phase 1 & 2) | Hot Water Absorption Chiller System | 350 TR | Shabbir Tiles |
| 19 | National Hospital Defence, Karachi | Central System Installation | 350 TR | Amir Ali Qamar |
| 20 | IBM School, Sukkur | Split A/C System | 350 TR | Naqvi & Siddiqui |
| 21 | State Bank Library Building, Karachi | Central Absorption System | 300 TR | Naqvi & Siddiqui |
| 22 | IoBM School & College, Karachi | Split A/C System | 300 TR | Amir Ali Qamar |
| 23 | K.M.A. Hospital, Karachi | Central System | 300 TR | K.M.A. Hospital |
| 24 | Arif Habib Center, Karachi | Central Chilled Water System | 270 TR | Mr. Mohsin Aarain |
| 25 | Arabian Textile Mills | Multi Energy Absorption Chiller | 250 TR | Arabian Textile |
| 26 | Allied Bank Building, Islamabad | Central Chilled Water System | 220 TR | Osmani & Co. |
| 27 | Embassy Hotel, Karachi | Central Absorption System | 220 TR | Mahmood & Pervaiz |
| 28 | Aisha Hotel Saddar, Karachi | Central Chilled System | 200 TR | Management Aisha Hotel |
| 29 | Nishat Textile Mills, Nishatabad | Central System | 200 TR | Nishat Mills |
| 30 | Serena Hotel, Murree | Hot Water Absorption Chiller | 200 TR | Serena Hotels |
| 31 | FTC Building Auditorium, Karachi | Plumbing & A.C. Works | 150 TR | F.T.C. |
| 32 | Merck, Sharp & Dohme, Karachi | Central Chilled Water System | 150 TR | MSD Pakistan |
| 33 | Liberty Textiles, Karachi | Hot Water Absorption Chiller | 150 TR | Liberty Textile |
| 34 | Afroz Textile Mills, Karachi | Central System | 150 TR | Afroz Textile |
| 35 | Bio Tech Pharmaceutical, Karachi | Central System | 150 TR | Bio Tech |
| 36 | Abu Dhabi Palace | Central Absorption System | 150 TR | Ashfaq Associates |
| 37 | Emaar Giga Street of Dreams | Central A/C System | 150 TR | EMAAR GIGA |
| 38 | Arabian Sea Country Club | Packaged System | 120 TR | ASCC |
| 39 | NHA Head Office Building, Karachi | Central Absorption System | 120 TR | Consulting Group |
| 40 | Pak Swiss Training Centre, Karachi | Central Chilled Water & Fire Fighting | 110 TR | Asaf Jafri Associates |
| 41 | Reckitt & Colman Offices, Karachi | Split Type Packaged System | 100 TR | Habib Fida Ali |
| 42 | Technocity Shopping Mall, Karachi | Central System | 100 TR | Technocity |
| 43 | Pearl Continental Hotel, Karachi | Central System & Fire Fighting | 100 TR | P.C. Hotel |
| 44 | Standard Chartered Bank Level-1 HO | Central Absorption System | 100 TR | Naveed-ul-Hussan |
| 45 | Atlas Honda, Karachi | Packaged System & Central System | 130 TR | Collaborative Design |